Saving Energy Consumption Through Integrated Systems:
2018
A corporate owner / occupier, required our specialist services, as their fully occupied building was approaching its 15 year lifecycle refresh. They...
Disused high street bank transformed into collaborative hub:
London, 2015
The disused high street bank contained a huge open space inside and was located in an easily accessible prime footfall area. The new owners wanted a...